Kamp Lokal Apr 6, 2026
- Mark Go
- 5 minutes ago
- 1 min read
High Hang Power Snatch
3 Sets
3x (1 Barbell Jump & Shrug + 1 High Hang Power
Snatch) @5/10 RPE
This is SPEED WORK: Meant to be with very light weight and working speed, explosiveness and timing
Hang Pause Power Snatch + Hang
Pause Snatch
5 Sets
1 Hang Pause Power Snatch + 1 Hang Pause Snatch
@60-70% 1 RM Snatch
*Pause in receive for 3 seconds.
**Rest as needed between sets.
Bench Press
6 Bench Press @6/10 RPE
6 Bench Press @6.5/10 RPE
4 Bench Press @7/10 RPE
4 Bench Press @7.5/10 RPE
2 Bench Press @8/10 RPE
2 Bench Press @8.5/10 RPE
*6-8 controlled Ring Rows In between sets.
**Rest as needed between sets.
Metcon:
50 Wall Ball (20/14)
35 Toes to Bar
50 Box Jump Over (24/20)
35 Toes to Bar
50 Wall Ball (20/14)
Time Cap: 20 minutes
Scaled:
40 Wall Ball (20/14)
25 Toes to Bar
40 Box Jump Over (24/20)
25 Toes to Bar
40 Wall Ball (20/14)



Comments